Basic Rotary Drilling Components.

Image
 Basic Rotary Drilling Component.       The Basic Rotary Drilling Component Are Given Below.      1: Derrick or mast.      2: Substructure.      3: Mud Pump.      4: Prime Movers.      5: Drill String.      6: Rotary Bit.      7: Drilling Line.      8: Travelling Block.      9: Crown Block.      10: Draw Works.      11: Rotary Table.      12: Swivel.      13: Blow Out Preventer. .    14: Hooks. 1: Derrick or Mast :          A  derrick  is a lifting device composed at minimum of one guyed         mast , as in a gin pole, which may be articulated over a load by        adjusting its guys. Most  derricks  have at least two components,        either a guyed  mast...

Well Control System on Drilling Rig.

Image
Well Control System: well control during drilling the various systems put in place to control well and prevent a blowout incident from occurring we will also review the main reasons behind some of AD CO-Es  well control incidents which were handled successfully prior to the preparation of the drilling program the asset development team submits the final well prognosis to the drilling team the well prognosis is initiated by the petroleum engineer the reservoir engineer then makes a planning overview and provides the required formation pressures and temperatures then the following data is completed geodetic data conceptual data geological data reservoir data geophysical data and petrol physical data once all the data is entered the well prognosis will be approved by the reservoir operations asset team leader and will be published in ad Co system let's begin by explaining well control while drilling it is essential to perform activities in a safe way which will prevent uncontrolled fl...