Well Control System on Drilling Rig.

Well Control System:

well control during
drilling the various systems put in
place to control well and prevent a
blowout incident from occurring
we will also review the main reasons
behind some of AD CO-Es well control
incidents which were handled
successfully

prior to the preparation of the drilling
program the asset development team
submits the final well prognosis to the
drilling team the well prognosis is
initiated by the petroleum engineer the
reservoir engineer then makes a planning
overview and provides the required
formation pressures and temperatures
then the following data is completed
geodetic data conceptual data geological
data reservoir data geophysical data
and petrol physical data once all the
data is entered the well prognosis will
be approved by the reservoir operations
asset team leader and will be published
in ad Co system let's begin by
explaining well control while drilling
it is essential to perform activities in
a safe way which will prevent
uncontrolled flow of formation fluids
and gases from the reservoir to the
well-bore and surface surroundings this
is called well control this includes
measures practices

procedures and equipment work over and
completion as well as the installation
repair maintenance and operation of
surface well control equipment it also
consists of well control barriers which
are divided into two groups primary and
secondary barriers the primary well
control barrier is the fluid column
hydro-static pressure referred to as
well-bore pressure that provides over
balance against the formation pressure
this column must be monitored and
maintained during drilling and tripping
to prevent formation fluids from
entering into the well-bore during
drilling if the fluid column is not
maintained with adequate mud density
making the formation pressure more than
the hydro-static pressure
formation fluids will find a way into
the well-bore and a kick will occur in
this case the well must be secured and
killed there are other cases when a kick
can occur let's review some of them
while tripping if there is a failure to
keep the hole full of mud to maintain
adequate hydro-static head then the
hydro-static pressure will be less than
the formation pressure inducing a kick
swabbing while pulling out of a hole too
fast can produce a suction effect
resulting in a decrease in the bottom
hole pressure large enough to allow
formation fluids to enter the well-bore
creating a kick
when drilling takes place too fast and
into depleted reservoirs without proper
reinforcement it can lead to cracking in
the walls and thus losing fluids into
the formation inducing a kick once a
kick is detected the secondary well
control barrier blowout prevent-or BOP

must be activated immediately by the
driller to secure and shut the well for
killing operations this is done by
closing the BOP using one of the BOP
control panels one situated on the rig
floor and the second situated in the 
me unit the driller will shut in the
blowout presenter to stop the flow of
formation fluids out of the well bore
then he will activate the alarm and
notify at code drilling supervisor and
rigged manager meanwhile at the rig site
the on-scene commander AD-CO drilling
supervisor will notify AbuDhabi telecom
operator and relevant assets control
room and raise emergency tier 1 which
activates appropriate emergency response
teams unnecessary crew will be evacuated
to the nearest assembly point the next
step will be to monitor the shut in
drill pipe and the shut in casing
pressure gauges
the kick will be circulated out of the
well-bore using the driller method first
cycle by pumping drilling fluid down
string and getting returns from the
analyst through the choke line to the
choke manifold and the poor boy de Gaza
and toxic gases will be flared once the
kick is out the well will be shut in
then the well will be killed with
weighted mud by circulating the kill
fluid until both the drill pipe and
casing pressures reach zero if all of
the well control barriers failed such as
human barriers BOP

equipment barriers
and system barriers and the BOP leaked
while circulating the kick out this
could lead to uncontrolled flow of
formation fluids and possibly a blowout
a blowout has massive catastrophic
consequences such as injuries and/or
fatalities of personnel release of toxic
gases pollution of the environment asset
damage and damage of AD CO-Es image and
reputation AD-CO strives to create a safe
and incident free working environment
for all this is why strong well control
integrity assurance systems have been
put in place these include policies
standards procedures people competency
and equipment
despite all of this ad Co has
experienced several well control
incidents which have been managed and
controlled successfully preventing a
blowout after sharing with you the
primary and secondary well control
barriers we will now share with you some
of the main causes behind AD CO-Es major
well control incidents no implementation
of top three concept plan
what if competent people in correct
formation pressure and drilling fluid
weight failure to implement management
of change procedure whenever there are
changes failure to maintain BOP

equipment
learning outcomes from such incidents
include ensure every drilling operation
begins with the discussion of the
top-three concept always use updated
reservoir pressure data for defining
drilling fluid weights make sure that
any change in the drilling plan is
governed by an approved management of
change process in case of well control
shut in the well immediately as per AD-CO
procedures and consults your supervisor
in conclusion well control incidents
must be avoided by all means as they can
lead to blowouts which have catastrophic
impacts at AD-CO we expect from all the
well drilling stakeholders to ensure
100% full implementation of AD-CO well
control integrity assurance systems it
is the responsibility of all managers
and supervisors both in the office and
at the rig site to verify and enforce
the full compliance of these systems to
avoid catastrophic incidents from
happening with your continuous

dedication compliance to AD-CO procedures
and your full commitment we prevent well
control incidents from happening in AD-CO.