drilling methods in petroleum industries

 Drilling methods

          There are two main method for 

              drilling . These are given below:

         1: Cable tool drilling method.

         2: Rotary drilling method.

   1: Cable tool drilling method:

         Cable tool drilling is one of the

oldest cutting actions utilized in the
drilling industry developed in China

over 4000 years ago the cable tool is
tried-and-true responsible for millions
of successful wells around the world
this system is still used today because
of its own unique advantages which
include one-person operation low
equipment cost compared to other systems
simple rugged design requiring minimal
maintenance low horsepower requirements
of this rig and finally cable tools have
proven to be virtually indestructible
these machines are mainly used today for
drilling and unconsolidated materials
and soft rock formations where
relatively shallow depth wells are
required approximately 100 feet or less
slow penetration rates are
characteristic of this drilling system
support equipment required for this
drilling process are basic a small truck
with welding equipment torches and a
small amount of makeup water a
separately mounted deck engine powers
the rig the cable tool uses the
percussion cutting action utilizing a
1200 pound drill string and usually a
carbide button bit this bit goes up and
down once per second performing four
important drilling functions at once
penetrating the material beneath the bit
reaming the sides of the hole crushing
the geology into fine particles and
mixing these cuttings with water
the drilling action in conjunction with
approximately five gallons of introduced
water mixes with the cuttings which
require baling after approximately four
feet of drilling this flushing system
requires the drill string to be tripped
out of the hole and the baler to be
tripped into the hole the baler is
simply a hollow tube with a check valve
on the bottom which fills with the
cutting slurry mixture the action of the
dart valve enables the baler to collect
cuttings for ID and recording purposes

as per regulation 9:03 as well as
removing accumulating cuttings by
dumping them in the mud spunk the baler
is also useful for measuring approximate
water pumping rates and levels at any
time during the well construction the
cuttings from the borehole are usually
well mixed and small in size
representing an accumulation of the
formations encountered since last bail
the cable tool drillers have developed
the ability to interpret the feel of the
drill stream to improve well log
accuracy and in identifying aquifers the
cable tool drilling process typically
consists of drilling removing the
cuttings identifying the geology
monitoring the water flow if present and
then advancing the casing there are two
methods for casing advancement the drive
cap and the drive blocks the drive cap
is primarily used by cable tool
operators until such time is increased
friction is encountered
the drive blocks that enable more energy
to be transferred to assist with driving
the casing down the casing advancement
continues in overburdened situations
until such time as a suitable aquifer is
encountered or until the casing is
firmly seated in bedrock
after which casing is no longer required
as the geology itself or rock stabilizes
the hole the large bowl reel shown here
supports the cable which in turn

supports the drill string the speed at
which it is turning here is typical of
hole advancement in unconsolidated
material ideally casing is added in
10-foot sections to improve efficiency
additional casing sections are usually
welded ensuring a watertight seal as
required per regulation 9:03
the annular space between the working
casing and the permanent casing is
commonly grouted after borehole
construction.

Comments

Popular posts from this blog

Phases of petroleum industry

Folding Treadmill Exerciser Foldable Walk Running Machine Portable Treadmills for Home and Apartment LCD Display and Bluetooth Speaker No Assembly.