Drilling rig power system.

Drilling rig power system-how it works:


 Power system the power system is one of




the most important aspect of drilling
rate because it is needed to power up
our drilling rig system including rotary
system self-protect system hosting
system blowout prevention system and
monitoring system depending on the rate
horse power will have a number of engine
generator set available on the right in
this picture we have three engine set
generator this is engine set generator
number one this engine generator set
number two and this one is 
generator set number three so this
Indian generator said we'll use the
diesel fuel to operate the generator and
generator will will generate the

electricity from all these
generator set electricity is given to
power distribution system which can be
VFD our ser silicon control rectifier
our variable frequency drive ser is used
in case of red currant and VFD is you
case a poverty current if we have scr
power distribution system on the rail
then it means we will have DC motors



working with rotary table draw out TDs
our mud pumps in case if we have VFD
power distribution system on the red it
means we will have AC motors
see electric motors rotary table with
Robert with TDs and also with them what
palms so electric power from power
distribution system is then given to all
these individual rate component
including Matt Baume
tedious draw through to table he one we
will have the electric power lighting
purposes on the rig floor of the mask
will have the electric supply for the

Martin system a circulation system
similarly we will give electric power
for the minicam on the under eight where
we'll have the accommodation for
important personal will be required for
the drilling operation depending on the
nature of the operation other word
rolling we are flipping our we happen to
have some other operation it will depend
that how much we have the workload
according to that we will need the
number of engine generator we need to
keep running the maximum power required
of the rate it will be when we will go
for the hardback trimming in this
scenario while hardback remain we will
be rotating the strength with the
tedious meanwhile with a drawback we
will be who will perform in the hosting
operation as well and Markham will also
be running for the circulation so this
is the case
Elnora when will have maximum power
required to perform this operation
whereas minimum operation it will be
required when mark pump TDS draw out a
rotary table will be installed by mood
and it will happen only when will go for
wire-line operation in that case will
need minimum electric power that will be
only for power for lighting on the
masked hard area under red floor andand
on much system and the power required it
will be only for the mini mini camp as
well
it is important to note over here that
our I can have VF d dr r as we are dry
and it is also possible that Rick may
have the hybrid system I mean it may
have VFD and as he are both together
for example if mud pumps draw out rotary
table have DC motor then we will use ser
to run these these ready treatment if
tds have AC motor than we will lead VFD
to run the tedious with the AC current.